Preliminary Suitability Study

A qualitative preliminary suitability study allows us to minimise manufacturing costs.

We select the optimal locations of substations and interconnection routes by implementing high-level design specifications.

Qualitative Preliminary Suitability Study

Qualitative Preliminary Suitability Study

At this stage, Synenergy carries out a preliminary design - study of interconnection works. Specifically, we select the location of the Substation and the routing of the high voltage transmission line. A high-quality initial design ensures that the total construction cost to be borne by the customer is minimised, while also creating a sound basis for the drafting of subsequent studies.
Upon completion of the preliminary study, the customer receives the corresponding dossier to be submitted to the Greek Independent Power Transmission Operator (IPTO, Greek ΑΔΜΗΕ).

What our services include

The dossier to be submitted to the Operator contains the preliminary study prepared in accordance with the specifications. The study includes:

  • Transmission Line Preliminary Routing Study in an orthophotomap background
  • Transmission Line Preliminary Routing Study in a contour line background
  • Brief Technical Description of the Transmission Line

We are trusted

Terna energeiaki
Iberdrola
Copezouzos group
Innovative power
Motor oil
Edf
Intrakat
Kiefer
Enteka
Ventus ate
Protasis
Maximus terra
Hlmekat
Atermon
Alternus
Afcon

Talk to
our engineers today!