Interconnection of a Wind Power Plant in Achaia

Share:

Interconnection of a Wind Power Plant in Achaia

Requirements

The diversion of an existing extra-high-voltage transmission line to facilitate the development of a substation while also enabling the interconnection of a wind power plant being developed in the Achaia area with the Hellenic Electricity Transmission System (HETS).

Client

ATERMON

ATERMON


Challenges

The compact design of the new overhead network was a key requirement to minimize interventions, given that the interconnection works are being developed near arable farmland. This choice, while critical for respecting the surrounding environment, leaves little room for flexibility.

Method of project completion

In close collaboration with the client, and taking into account both the technical soundness and constructability of the interconnection works, we completed the implementation study of the new 400 kV transmission line. The design, aimed at minimizing interventions, promptly secured a positive recommendation from the competent authority.

Related Services

  • Detailed Design of HV Transmission Lines

The client now holds a complete implementation study, ready for construction.

  • Starting Date

    May 2024

  • Project Completion

    December 2024

  • Industry

    Power plant development companies

We are trusted

Terna energeiaki
Iberdrola
Copezouzos group
Innovative power
Motor oil
Edf
Intrakat
Kiefer
Enteka
Ventus ate
Protasis
Maximus terra
Hlmekat
Atermon new logo
Alternus
Afcon

Talk to
our engineers today!