New MV/150/400 kV Step-Up Substation and Its Interconnection to the HETS in Desfina, Phocis


Challenges
The geomorphologically and geotechnically demanding terrain, combined with the lack of available suitable land for development, posed significant challenges for the establishment of the "hub." More specifically, it was necessary to identify sufficient and appropriate space for the development of the Substation, which would also facilitate its connection to the HETS, while maintaining the robustness and reliability of the grid.
Method of project completion
A multiparametric design and siting of the various substation facilities, with a focus on both the constructability of the substation and its connection to the HETS. Great emphasis was placed on the clear definition of the construction phases of the high-voltage and extra-high-voltage transmission lines, starting from the preliminary study stage.
Related Services
- Preliminary Suitability Studies
The client received the overall design of the “hub,” including the substation and its interconnection with the HETS, with clearly defined construction phases, ensuring constructability of the project and preservation of system reliability at every stage.
Starting Date
November 2024
Project Completion
May 2025
Industry
Power plant development companies