Challenges
The design of an extensive overhead network that fully complies with environmental and spatial requirements while simultaneously ensuring the techno-economic optimization of the project. Key challenges included the presence of numerous existing and under-development photovoltaic parks in the area, the development of other overhead networks, and the proximity to existing critical infrastructure.
Method of project completion
Taking into account all environmental and spatial requirements, and focusing on the technical soundness and reliability of the new 400 kV transmission line, we completed its design accurately and on time, securing prompt positive approval from the authorities.
Related Services
- Evaluation of Energy Project Interconnection
- Interconnection Line Study for Inclusion in the Environmental Impact Assessment (EIA)
- Preliminary Suitability Studies
Delivery of the pivotal design of the interconnection project, accurately and on schedule, ensuring prompt positive approval from the competent authorities.
Starting Date
April 2023
Project Completion
July 2024
Industry
Power plant development companies